Use the below search options at the bottom of the page to find information regarding recent decisions that have been taken by the council’s decision making bodies.
Alternatively you can visit the officer decisions page for information on officer delegated decisions that have been taken by council officers.
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/02/2021
Effective from: 13/01/2021
Decision:
To reduce 1 Oak
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/02/2021
Effective from: 13/01/2021
Decision:
To reduce 1 Oak
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 13/01/2021
Decision:
Trim one Yew.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 13/01/2021
Decision:
Reduction of 1 Oak.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 13/01/2021
Decision:
Reduction of 2 Hawthorns.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 11/01/2021
Decision:
Reduce 2 Sycamores and remove 1 Conifer.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 11/01/2021
Decision:
Reduction of conifer hedge.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 11/01/2021
Decision:
To remove 1 Lombardy Poplar.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 19/02/2021
Effective from: 13/01/2021
Decision:
1 Pine Tree - trim canopy.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 03/02/2021
Effective from: 19/01/2021
Decision:
To grant planning permission
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 03/02/2021
Effective from: 21/01/2021
Decision:
To grant planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 03/02/2021
Effective from: 21/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 03/02/2021
Effective from: 21/01/2021
Decision:
To grant planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 03/02/2021
Effective from: 21/01/2021
Decision:
To grant planning permission
20/01370/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
Prior Approval Not Required
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 20/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 19/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 19/01/2021
Decision:
To refuse planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 18/01/2021
Decision:
Prior Approval Not Required
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 18/01/2021
Decision:
Prior Approval Not Required
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 18/01/2021
Decision:
To refuse planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 18/01/2021
Decision:
To grant planning permission
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 18/01/2021
Decision:
To refuse planning permission
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 14/01/2021
Decision:
To grant planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 14/01/2021
Decision:
To grant planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 14/01/2021
Decision:
To grant planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 02/02/2021
Effective from: 14/01/2021
Decision:
Lawful Use Certificate Granted
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 01/02/2021
Effective from: 22/01/2021
Decision:
Deed of Variation relating to application
12/00109/FUL and 20/00648/FUL is attached and can be found in the
Documents sections of these reference numbers on Public Access. The
associated Section 106 Agreement is available to view on
12/00109/FUL.
Lead officer: Graham Nourse
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 01/02/2021
Effective from: 22/01/2021
Decision:
Deed of Variation relating to Unilateral
Undertakings under applications 17/01811/OUT and 20/00134/FUL is
attached and can be found in the Documents section of these
reference numbers on Public Access. Scanned versions of the
Unilateral Undertakings are also available under there reference
numbers.
Lead officer: Graham Nourse
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 01/02/2021
Effective from: 22/01/2021
Decision:
Deed of Variation relating to Section 106
Agreement for application 15/01737/OUT is attached and can be found
in the documents section of 15/01737/OUT on Public Access. The
original Section 106 agreement is also available to view.
Lead officer: Graham Nourse
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 01/02/2021
Effective from: 22/01/2021
Decision:
Deed of Variation relating to Section 106
Agreement for application 17/00790/FUL is attached and can be found
in the documents section of 17/00790/FUL on Public Access. The
original Section 106 Agreement can also be viewed.
Lead officer: Graham Nourse
The Community Champions Scheme administered by
the Ministry of Housing Communities and Local Government announced
a £25m funding scheme to support people to be most at risk
from Coronavirus (Covid 19) , including those most at risk from an
ethnic minority background , disabled people and others to follow
safer behaviours and reduce the impact of the virus on themselves
and others around them.
The AD of Partnerships with the approval of Management Team
submitted a bid to the fund for £220,000 to support the work
of Community Champions across the District and to employ a Projects
Officer to co-ordinate this work.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 25/01/2021
Effective from: 20/01/2021
Decision:
The decision was made by the AD Partnerships ,
following approval from Management Team to make a bid to the
Ministry of Housing, Communities and Local Government to support
community groups across the District.
Lead officer: Anastasia Simpson
Decision Maker: Resources and Services Overview and Scrutiny Committee
Made at meeting: 14/01/2021 - Resources and Services Overview and Scrutiny Committee
Decision published: 22/01/2021
Effective from: 14/01/2021
Decision:
The Committee received the report submitted to Cabinet on 18 December 2020 on the HRA Budget for 2021/22 including the movement in Housing Revenue Account (HRA) Balances, the level of fees and charges for 2021/22 and the HRA Capital Programme. In particular, the attention of Members was drawn to:
· Only limited changes to the HRA budget were proposed in 2021/22, pending a longer-term review of the HRA business plan during 2021.
· 2020/21 was the first year that the Government allowed rents to be increased following a 4-year period where they were required to be reduced by 1% each year.
· In-line with rent setting guidance issued by the Regulator for Social Housing, rents are proposed to be increased by the Consumer Price Index plus 1% in 2021/22 (a 1.5% increase) to continue the recovery from the 4 years of rent reductions mentioned above.
· The average weekly rent proposed for 2021/22 is £84.10 (£82.42 in 2020/21)
· Although the above increase in rents generates additional income of £0.193m, other changes to the budget have more than offset this position with an overall deficit of £0.012m forecast for 2021/22.
· It was proposed to fund this relatively small deficit by drawing money down from the HRA General Balance, which was estimated to total £5.257m at the end of 2021/22 after taking into account this adjustment.
· The proposed HRA Capital Programme for 2021/22 totals £3.457m and continued to provide for a range of schemes and projects.
· The Capital programme included a revenue contribution of £0.281m to support new build and acquisition projects. This on-going budget could either support the direct cost of projects within the capital programme or meet the borrowing costs that were likely to be required to deliver the 200 new properties the Cabinet had committed to provide.
· Relevant matters in respect of the potential to fund an increase in the level of borrowing required to deliver the new build projects at the speed and scale committed too.
· The HRA general balance was forecast to total £5.257m at the end of 2021/22, which retained a strong financial position against which the HRA 30 year Business Plan could be further developed.
· ‘Old’ HRA debt continued to reduce year on year as principal is repaid with a total debt position at the end of 2021/22 forecast to be £36.777m (A reduction of £1.664m compared with the figure at the end of this year).
The Committee thereupon undertook its scrutiny of the HRA Budget Proposals for 2021/22.
Prior to the meeting, questions were submitted to the Housing Portfolio Holder in respect of the HRA and these are set out in the Appendix to these Minutes together with the responses provided.
The Housing Portfolio Holder, Councillor P B Honeywood, accompanied by the appropriate Senior Officer, attended the meeting and assisted the Committee in its enquiry of the matters put to him in respect of the HRA budget position.
Having considered all of the information that had been provided and acknowledging the measures to address the costs to the Housing Revenue Account of unrented Council housing (‘voids'):
It was RESOLVED that CABINET be RECOMMENDED to set a target level for reducing void periods in 2021/22 in the housing stock with a view to providing specific focus to those measures.
Decision Maker: Resources and Services Overview and Scrutiny Committee
Made at meeting: 14/01/2021 - Resources and Services Overview and Scrutiny Committee
Decision published: 22/01/2021
Effective from: 14/01/2021
Decision:
The Committee received the details submitted to the Cabinet on 18 December 2020 in relation to the updated financial forecast and proposed budget position for 2021/22. In particular, the Committee was advised as follows:
· A ‘live’ 10-year forecast was maintained and reported to Members throughout the year.
· The most up to date position in December each year was translated into the detailed budget for the following year for consultation with the Resources and Services Overview and Scrutiny Committee.
· As part of maintaining a ‘live’ forecast, this report ‘built’ on the last position that was presented to Cabinet on 13 November 2020.
· Despite the challenging financial and economic environment, confidence in the long term approach to the forecast remained, which was supported by the forecast risk fund. It is also worth highlighting that the managed position in terms of reserves continued to enable the Council to respond to exceptional events such as the COVID 19 crisis.
· At this stage of the budget process, there was a net deficit of £1.647m forecast in 2021/22, an improvement of £0.128m compared with the £1.775m deficit reported to Cabinet on 13 November 2020. Therefore, the forecast remained within the financial boundaries set out in the long-term plan.
· Although subject to potential changes over the remaining budget-setting period, the current forecasted deficit of £1.647m would be met by drawing money down from the forecast risk fund.
· At the time of finalising this report, the Local Government Finance Settlement for 2021/22 had yet to be announced. They would be included in the figures that would be presented to Cabinet in January 2021 when it considered its final budget proposals for recommending to Full Council in February 2021. The budget included a council tax levy increase of £5, with this level of increase expected to be confirmed as allowable as part of the finance settlement announcements. No revenue support grant had been included in the budget for 2021/22, but similarly to the late announcement last year, the Government could provide some funding again next year, especially when reflecting on the financial impact of COVID 19 on Local Authorities.
· Once the final position for 2021/22 was determined, the remaining years of the 10-year forecast would be revised, set against the budget position for 2021/22 and would be reported to Members later in the budget setting process.
In addition to the above, the Committee was advised of the following in respect of reserves, provisions and one-off sums for specific projects:
RESERVES |
|
|
Current Budget 20/21 |
|
|
|
|
Balance 31 March 2020 |
Contributions From |
Contributions To |
Estimated Balance 31 March 2021 |
|
|
£ |
|
0 |
£ |
Earmarked Reserves |
|
|
|
|
|
Revenue Commitments Reserve |
|
11,257,870 |
(10,175,320) |
|
1,082,550 |
Capital Commitments Reserve |
|
3,793,110 |
(3,793,110) |
13,820 |
13,820 |
Forecast Risk Fund |
|
3,253,000 |
(393,240) |
393,240 |
3,253,000 |
Asset Refurbishment / Replacement Reserve |
|
1,269,288 |
|
|
1,269,288 |
Beach Recharge Reserve |
|
1,500,000 |
|
|
1,500,000 |
Benefit Reserve |
|
999,790 |
|
|
999,790 |
Building for the Future Reserve |
|
2,609,750 |
(1,370,940) |
|
1,238,810 |
Business Rate Resilience Reserve |
|
1,758,422 |
|
|
1,758,422 |
Commuted Sums Reserve |
|
389,402 |
(28,000) |
|
361,402 |
Crematorium Reserve |
|
154,252 |
|
|
154,252 |
Election Reserve |
|
0 |
|
30,000 |
30,000 |
Haven Gateway Partnership Reserve |
|
75,000 |
|
|
75,000 |
Leisure Capital Projects Reserve |
|
124,000 |
|
50,000 |
174,000 |
Planning Inquiries and Enforcement Reserve |
|
99,000 |
(20,000) |
|
79,000 |
Residents Free Parking Reserve |
|
221,000 |
|
|
221,000 |
Section 106 Reserve |
|
1,388,673 |
|
|
1,388,673 |
|
|
|
|
|
|
|
|
28,892,557 |
(15,780,610) |
487,060 |
13,599,007 |
Uncommitted Reserve |
|
4,000,000 |
|
|
4,000,000 |
Total Reserves |
|
32,892,557 |
(15,780,610) |
487,060 |
17,599,007 |
Funded Projects / Initiatives List |
|
List Includes both Revenue and Capital Budgets |
|
Item |
Budget 20/21 |
Business Investment and Growth Projects |
1,585,530 |
Starlings and Milton Road Development |
1,556,380 |
Garden Communities – Tendring-Colchester Border |
1,300,000 |
Rural and Urban Infrastructure Fund |
1,184,310 |
Back to Business Initiative |
862,000 |
Community Housing Trust Grant Supported Projects |
628,010 |
Clacton Leisure Centre - Spa and Wetside Re-development |
521,480 |
Tendring Community Fund |
500,000 |
Housing in Jaywick Sands |
464,230 |
Office Rationalisation |
355,100 |
Climate Emergency Initiatives / Energy Efficiency Schemes |
313,450 |
Future High Streets Fund |
306,790 |
Planning Improvement Projects |
258,380 |
Additional enforcement activities |
249,000 |
Clinical Commissioning Group Wellbeing Hub |
245,000 |
Beach Hut/Seafronts Investment Plan |
208,810 |
Clacton Multi-Storey Car Park Repairs |
180,000 |
Health and Safety Programme of Activities |
165,000 |
Clacton Town Centre Fountain |
159,080 |
Laying Out Cemetery Works |
154,650 |
Empty Homes Initiatives |
152,220 |
Digital Transformation Projects |
129,340 |
European Union Exit Preparation |
126,410 |
Housing Early Intervention Officer - 3 year fixed term post |
100,000 |
Public Health - Improvement Projects |
94,580 |
Private Sector Innovation & Enforcement Grant |
85,360 |
Martello Tower Repair Works |
83,580 |
New Beach Huts |
64,600 |
2 One year fixed term posts to support improvements to the overall appearance of the district |
44,000 |
Public Convenience Works |
40,000 |
Princes Theatre Toilets |
40,000 |
Street Lighting Upgrade Project |
35,570 |
Green Waste Service Improvement Projects |
28,780 |
Total |
12,221,640 |
EXTERNALLY FUNDED PROJECTS |
|
Item |
Budget 20/21 |
Jaywick Sands Commercial Units |
2,000,000 |
Celebrating 150th Anniversary of Clacton |
250,000 |
OTHER PROJECTS |
|
Item |
Budget 20/21 |
Freeports |
n/a |
Building Council Homes |
n/a |
Environmental Health Officers to Respond to Brexit requirements at Harwich Port |
n/a |
The Committee thereupon undertook its scrutiny of the Financial Forecast / Budget Proposals for 2021/22.
Prior to the meeting, questions that the Committee Members had raised had been circulated to the relevant Cabinet Members and Officers in order to enable responses to be provided. Those questions and responses form the Appendix to these Minutes.
Members of the Cabinet, accompanied by the appropriate Management Team Member or other Senior Officer, attended the meeting in turn and assisted the Committee in its enquiry of the matters put to them in respect of the budget position and allocation of funds.
Having considered all of the information that had been provided it was RESOLVED that the CABINET be RECOMMENDED that:
(a) In respect of future outturn positions on the Council's annual budget, to allocate as a priority any available underspend following permitted carry forwards to extend further the measures to achieve the Back to Business Agenda of the Council.
(b) Further to (a), to establish a Business Roundtable for the District as part of the Back to Business Agenda and to inform that Agenda going forward.
(c) To reassess all the current reserves, provisions and one off sums allocated by the Council to determine whether they were still required, relevant to the Council’s Corporate Plan and the associated sum was at the appropriate level and:
(i) to re-allocate sums such as those for the Clacton Town Centre Fountain and Residents Free Parking (where the cost has been incorporated in the base revenue budget) to more closely align with the Corporate Plan priorities of the Council.
(ii) to identify the specific intentions for the £1.585M for Business Investment and Growth Projects reserve or otherwise look to reallocate that reserve.
(iii) To allocate a further £56k to resourcing public realm improvements across the District (supplementing and extending the £44k set aside to fund ‘2 One year fixed term posts to support improvements to the overall appearance of the District') thereby allocating a total of £100k to this initiative in total.
(iv) From the reallocation process, and in recognition of the additional £110k in recycling credits achieved by the Council in 2020/21, to identify £10k to improve recycling bring sites operated by the Council in the District to improve the attractiveness of those sites, signage at and to those sites and thereby further encourage their use and address relevant issues at those sites.
(d) To request that proposals for use of the Tendring Community Fund be developed swiftly so that these can be put in front of a meeting of the Portfolio Holder Working Party on the Tendring Community Fund without delay.
(e) To identify whether existing funding in the revenue budget and reserves, provisions and one-off sums enables the Council to adequately support co-ordinated measures to address the mental health needs of the local population as we ultimately come out of covid-19 pandemic restrictions and if this is found to be insufficient to look to allocate further resources as necessary to address those needs..
(f) To pro-actively assess and monitor the resources required to deliver a dynamic and expansive Tourism Strategy for the District (and the Year 1 delivery plan to accompany that Strategy) to maximise the advantage to the District as soon as covid-19 pandemic restrictions are lifted and extending beyond the normal summer season.
It was further RESOLVED that:
(a) The work underway in respect of ‘auditing' one off sums and the schemes they are intended to fund and to review progress with this at the March meeting of the Committee. That this review should include details of the original decision to allocate the funds and an assessment as to whether the scheme is on target to be delivered.
(b) The receipt, allocation, timing and use of section 106 funds to support community infrastructure associated with development in the District be reviewed by the Committee as part of its work programme.
(c) The Chairman of the Committee is requested to urge the Portfolio Holder for the Environment to undertake further efforts with Essex County Council and Highways England to secure a good level of cleaning on the A120 and A133 in view of the extensive uses of those roads and the impression given to visitors that litter is acceptable from the current level of rubbish alongside those roads.
(d) That the Community Leadership Overview and Scrutiny Committee be invited to consider the mental health support to residents referenced above in recommendation to the Cabinet (e).
Decision Maker: Resources and Services Overview and Scrutiny Committee
Made at meeting: 14/01/2021 - Resources and Services Overview and Scrutiny Committee
Decision published: 22/01/2021
Effective from: 14/01/2021
Decision:
On this occasion no Councillor had submitted notice of a question.
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
To grant planning permission
20/01633/FUL
Lead officer: Trevor Faulkner
21/00036/HCVRN Hackney Carriage Vehicle
Licence Renewal
T113 Mr C Welsh
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
To grant planning permission
20/01627/FUL
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
To refuse planning permission
19/01946/OUT
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
To grant planning permission
20/01604/FUL
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
To grant planning permission
20/01598/FUL
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
To grant lawful use certificate
20/01721/LUPROP
Lead officer: Trevor Faulkner
21/00032/HCVRN Hackney Carriage Vehicle
Licence Renewal
T067 Mr J Field
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 22/01/2021
Effective from: 22/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00031/HCVRN Hackney Carriage Vehicle
Licence Renewal
T035 Mr M Pawilcz
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 22/01/2021
Effective from: 21/01/2021
Decision:
Granted
Lead officer: Karen Hayes
TDX2267 Personal Licence Grant
Miss D Fraylich is applying for Personal Licence Grant under the
Licensing Act 2003.
Police have been notified of this application on 21 Jan 21.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 21/01/2021
Effective from: 21/01/2021
Decision:
Granted
Lead officer: Karen Hayes
TDX2266 Personal Licence Grant
Mrs T P Harris is applying for Personal Licence Grant under the
Licensing Act 2003.
Police have been notified of this application on 20 Jan 21.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 21/01/2021
Effective from: 21/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Decision Maker: Leisure and Public Realm Portfolio Holder
Decision published: 21/01/2021
Effective from: 29/01/2021
Decision:
That one of the new roads under construction
at the development site - Land East of Tye Road, Elmstead Market,
Colchester, Essex and previously named "Leach Lane" is changed to
"Barley Lane".
Wards affected: Alresford & Elmstead;
Lead officer: Nina Underwood
Following a review undertaken in accordance with section 18C of the Representation of the People Act 1983 that was limited to the areas identified, to decide whether to make changes to the designation of polling places within certain parts of the District.
Decision Maker: Chief Executive
Decision published: 21/01/2021
Effective from: 21/01/2021
Decision:
Following a review undertaken in accordance with section 18C of the Representation of the People Act 1983 that was limited to the areas identified, the following be approved, the previous designations for the Polling Districts concerned be repealed and the Head of Democratic Services and Elections be authorised to implement the below:
In the Harwich and North Essex Parliamentary Constituency, that the Polling Place shall be the same as the Polling District (or otherwise as stated) for the following Polling Districts:
1.Bradfield (accommodating the proposed change of Polling Station Venue to Bradfield Community Centre, The Street, Bradfield, Essex CO11 2UU)
2. Dovercourt Vines And Parkeston (Vines) – to also include Dovercourt Bay (The Hangings) Polling District (accommodating the proposed change of Polling Station Venue to The Vibe Youth Centre, Main Road Harwich Essex CO12 4AH)
In the Clacton Parliamentary Constituency, that the Polling Place shall be the same as the Polling District (or otherwise as stated) for the following Polling Districts:
3. Pier East (accommodating the proposed change of Polling Station Venue to Church Hall, Christ Church United Reform Church, 6 Carnarvon Road, Clacton-on-Sea, Essex CO15 6BU)
4. Pier West (accommodating the proposed change of Polling Station Venue to Town Hall, Station Road, Clacton-on-Sea Essex CO11 1SE)
5. Eastcliff East (accommodating the proposed change of Polling Station Venue to Holland FC Clubhouse Dulwich Road Holland-on-Sea Clacton-on-Sea Essex CO15 5HP)
6. Eastcliff West (accommodating the proposed change of Polling Station Venue to Clacton Scout Headquarters Valley Road Clacton-on-Sea Essex CO15 6NA)
7. St Johns (North Road), Coppins (Wellelsey) and Coppins (Whitehall) – to also include St Johns (Tewksbury) (accommodating the proposed use of Polling Station Venue at Clacton Community Centre, 16-26 Valley Road, Clacton-on-Sea, Essex CO15 4AR for County Council elections)
And that local government electoral places be amended to identify the same changes as set out above.
Wards affected: Dovercourt Vines & Parkeston; Eastcliff; Pier; St John's; Stour Valley;
Lead officer: Keith Simmons
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 20/01/2021
Effective from: 11/01/2021
Decision:
To refuse permission to fell 1 Oak.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 20/01/2021
Effective from: 11/01/2021
Decision:
To refuse permission to reduce 1 Beech by
40-50%.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 20/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Chestnut by 3m
and remove ivy.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 20/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce all aspects of 1
Yew by 0.5m to suitable growth points.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 20/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Sycamore by
40%.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 20/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to fell 1 Self-Sycamore
and treat stump.
Lead officer: Clive Dawson
TDX2265 Personal Licence Grant
Mr Stuart James Hazell is applying for Personal Licence Grant under
the Licensing Act 2003.
Police have been notified of this application on 20 Jan 21.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 20/01/2021
Effective from: 20/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00027/HCVRN Hackney Carriage Vehicle
Licence Renewal
T284 Mrs A McNair-Jamieson
The application conforms with all Statutory and Local Authority
requirements and al consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 20/01/2021
Effective from: 20/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00021/HCCV Hackney Carriage Vehicle Licence
Change of Vehicle
T185 Mr A Gardiner
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 20/01/2021
Effective from: 20/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Online LGL Ltd. are able to provide this
additional legal support to maximise capacity to enable the
Authority to both pursue individual cases of anti-social behaviour
as well as developing the knowledge and training of the case
officers involved, and can do this entirely remotely.
In the first instance it is anticipated that the pilot will cover a
maximum of ten jobs or matters will be pursued with these matters
being monitored to decide if this is the most effective route for
dealing with such matters, with a review undertaken after 6
months.
Decision Maker: Assistant Director (Governance) & Monitoring Officer
Decision published: 20/01/2021
Effective from: 19/01/2021
Decision:
To instruct additional external legal support
to pursue legal action against those said to be committing or
undertaking anti-social behaviour such additional legal support to
include the instruction of Online LGL Ltd (company number 12225891)
in the first instance to oversee and advise on investigations as
well as taking proceedings through the Courts.
Lead officer: Lisa Hastings
A decision is required when entering into a
memorandum of understanding.
The Eastern Community Homes/ Local Authority Partnership has been
set up to cover the east of England and provide support to the
member organisations in respect of community led housing
development.
The Council is making a contribution of £3000 to the
partnership covering the period from April 2021 to March 2023. The
contribution will be paid from the Council's community housing fund
grant.
The Council has already been working on developing community led
housing in the district and this partnership will support and
complement the work that is already underway.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 19/01/2021
Effective from: 19/01/2021
Decision:
To enter into a Memorandum of Understanding
for the Eastern Community Homes' Local Authority Partnership
Lead officer: Tim Clarke
BT and Openreach are currently upgrading their
broadband infrastructure to meet the government’s target of
full fibre broadband coverage across all of the UK by 2033. As such
TDC have received a request to grant a Wayleave to install
equipment on its land and it is anticipated that more will be
forthcoming over the course of this project.
It is considered that use of the standard fees negotiated by the
NFU and CLA (Appendix A) will demonstrate best value without having
to pay for costly valuations, which in many cases are likely to
cost more than the value of the Wayleave agreements. It will also
speed up the process time supporting BT/Openreach to meet the
governments targets.
Granting of these Wayleave agreements will benefit the District
enabling better coverage across Tendring for its residents and
providing more attractive broadband availability for
Tendring’s businesses and those that may be looking to start
up or move to the area.
The Property Dealing Procedure as set out in the Constitution
states that “in any ransom or other circumstances where the
seeking of two valuations would be impractical in the opinion of
the Assistant Director (Building
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 19/01/2021
Effective from: 19/01/2021
Decision:
For Wayleave agreements requested from BT or
Openreach in respect of fixed line broadband cables, equipment and
infrastructure to be placed on TDC land, that does not directly
benefit TDC owned property, to adopt the national valuation fees as
negotiated by the NFU and CLA, details of these attached as
Appendix A.
Lead officer: Jennie Wilkinson
In order to support the sustainability and
subsequent growth of the taxi trade in the District. There is a
risk that without these decisions the District will lose Hackney
Carriage and Private Hire vehicles, drivers and operators, as they
simply will not be able to meet the renewal fee in a single
payment, subsequently imposing a financial pressure upon themselves
and their businesses.
Decision Maker: Assistant Director (Partnerships)
Decision published: 19/01/2021
Effective from: 16/12/2020
Decision:
Hackney Carriage and Private Hire Vehicle
Licensing –
Renewal fee proposal to pay in two instalments.
a) That an instalment payment process is introduced for the annual
renewal fee of Hackney Carriage and Private Hire vehicles as set
out in the attached report with immediate effect.
b) The option of instalment payments of the annual renewal fee
should continue until one calendar year after the date that the
current emergency period ceases, at which point the decision will
be reviewed.
Lead officer: Karen Hayes
Decision Maker: Leisure and Public Realm Portfolio Holder
Decision published: 19/01/2021
Effective from: 27/01/2021
Decision:
That the new road under construction at the
development site - Land at Hunters Moon, Colchester Road, Wix,
Essex is named "Hunters Court".
Lead officer: Nina Underwood
The Freeport East Board approved proposals to
build a website to support the bid.
Tendring District Council led on the procurement, and sought quotes
in line with procedure.
A company was chosen from those who submitted quotes.
Decision Maker: Assistant Director (Economic Growth & Leisure)
Decision published: 19/01/2021
Effective from: 18/01/2021
Decision:
Selection of supplier based on
quotations.
Lead officer: Tom Gardiner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce the crown of 2
Oaks by 30% and remove select lower branches.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To refuse permission to remove 1 Ash.
To grant permission to reduce 2 Oak by 1.5m.
Lead officer: Clive Dawson
21/00024/HCVRN Hackney Carriage Vehicle
Licence Renewal
T124 Mr T Downs
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 18/01/2021
Effective from: 18/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Ash by
50%.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to remove 1 Birch.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Copper Beech
and remove large branch towards no. 46.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Eucalyptus by
30%.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Blue Cedar by
50 % and remove 1 Cherry and 2 Birch.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission to reduce 1 Ash by
30%.
Lead officer: Clive Dawson
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 18/01/2021
Effective from: 04/01/2021
Decision:
To grant permission for the following works: 1
No. Sycamore - reduce by 30%, 1 No. Sweet Chestnut - reduce to 15
feet, 1 No. Sweet Chestnut - reduce by 30%, 3 No. Sycamores -
reduce by 35%, 1 No. Yew - reduce in height by 1m and crown lift up
to 3m, 1 No. sycamore - reduce by 30%, 1 No. Multi Stemmed Sycamore
- reduce by 35% and any regular maintenance.
Lead officer: Clive Dawson
The equipment forms part of the Councils
replacement rolling programme for vehicles and equipment and
sufficient budget is provided in this programme.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 18/01/2021
Effective from: 12/01/2021
Decision:
To accept recently sought quotations for
replacement items of grounds maintenance equipment used by the Open
Spaces service for grounds maintenance operations within the
Tendring District
Lead officer: Ian Taylor
21/00025/HCVRN Hackney Carriage Vehicle
Licence Renewal
T106 Mr M Pawilcz
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 18/01/2021
Effective from: 18/01/2021
Decision:
Granted
Lead officer: Karen Hayes
TDX2262 Personal Licence Grant
Mr T Burgess is applying for Personal Licence grant under the
Licensing Act 2003.
Police have been notified of this application on 18 Jan 21.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 18/01/2021
Effective from: 18/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00022/HCDRN3 Hackney Carriage Driver
Licence Renewal
Mr P Smith is applying for the renewal of his Hackney Carriage
Driver's Licence for a period of three years.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 18/01/2021
Effective from: 18/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
To grant planning permission
20/01247/FUL
A Unilateral Undertaking in relation to this application is
attached relating to RAMS and can be found in the document section
of Public Access.
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
To grant listed building consent
20/01248/LBC
Lead officer: Susanne Chapman-Ennos
05/01062/PREMGR Change of Designated Premises
Supervisor (DPS) Application
Tesco [Brook Retail Park]
Tesco Plc, Brook Retail Park, Clacton on Sea, Essex, CO16 9QX
Mr J Bale
Essex Police confirm no representation in respect of this
application and that the application for the variation of
Designated Premises Supervisor has accordingly been processed and
all parties notified as required by the Act.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
Granted
Lead officer: Karen Hayes
18/00483/PREMGR Change of Designated Premises
Supervisor (DPS) Application
Marks and Spencer
Unit 1, Kirby Road, Walton on the Naze, Essex, CO14 8QP
Ms S N Williamson
Essex Police confirm no representation in respect of this
application and that the application for the variation of
Designated Premises Supervisor has accordingly been processed and
all parties notified as required by the Act.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
To grant planning permission
21/00012/NMA
Lead officer: Tracey Coleman
Personal Licence Grant Application
Reference TDX2261 : 21
Mr V Yilmaz
Police have been notified of this application on 12 January
2021.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
Granted - no objections
Lead officer: Michael Cook
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
To grant planning permission
20/01702/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive.
The discharge of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
To refuse planning application
20/01441/FUL
Lead officer: Susanne Chapman-Ennos
S106 funding request from Lt Oakley Parish
Council.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 15/01/2021
Effective from: 21/10/2020
Decision:
To release £852.02 S106 monies to Lt
Oakley Parish Council to provide benches in the play area.
Lead officer: Kristy Childs
Request received from Weeley PC to release
S106 monies.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 15/01/2021
Effective from: 01/10/2020
Decision:
A further request from Weeley Parish to
release S106 monies this is in additions to releasing the original
funding to provide a new Petanque Rink. Whist installing the rink
they found that a bigger one was needed along with an accessible
path to the rink. They would like to release a further
£4204.00
Section 106 funding request, approved by Planning Services
Lead officer: Kristy Childs
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 15/01/2021
Effective from: 21/10/2020
Decision:
Request from Little Clacton Parish to release
£19093.53 from S106 towards building a new Multi Use Games
Unit (MUGA) at Plough Corner playing fields.
Lead officer: Kristy Childs
To release £40,000 S106 money to create
a memorial garden dedicated to the victims of the 1953 flood.
Approved by Planning
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 15/01/2021
Effective from: 04/12/2020
Decision:
To create a new Memorial Garden in Harwich
dedicated to the victims of the 1953 floods.
Lead officer: Kristy Childs
Section 106 funding request to make
improvements at the play area in Frinton. Approved by Planning
Service.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 15/01/2021
Effective from: 25/11/2020
Decision:
Request to release S106 to make improvements
that the play area in Frinton. The money allocated from S106
agreements can only be used to improve the play area known as
Roydon Way Frinton
Lead officer: Kristy Childs
Section 106 funding request approved by
Planning for improvements at Frinton Park.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 15/01/2021
Effective from: 07/12/2020
Decision:
To release S106 from Frinton, Walton and Kirby
for the refurbishment of existing tennis courts and improvement to
playing fields and open space.
Lead officer: Kristy Childs
Decision Maker: Leader of the Council and Corporate Finance & Governance Portfolio Holder
Decision published: 15/01/2021
Effective from: 15/01/2021
Decision:
(a) To approve the next phases of the Local Restrictions Support Grant (OPEN) Scheme and the Additional Restrictions Grant Scheme (ARG); and
(b) To authorise the Assistant Director (Finance & IT) to implement and administer the schemes and to amend the policies in line with any emerging Government guidance.
Lead officer: Assistant Director (Finance & IT) & Section 151 Officer
Section 106 funding request for Thorpe Parish
Council. Approved by Planning.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 14/01/2021
Effective from: 22/10/2020
Decision:
Request from Thorpe Parish Council to release
S106 monies. This is to be used to make improvements to the safety
surface at Lady Nelson Playing Field. The improvements are
necessary to enable the play area to be used by all safely.
Lead officer: Kristy Childs
Request to release S106 monies received by
Bradfield Parish Council and approved by Planning Services.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 14/01/2021
Effective from: 13/11/2020
Decision:
Request to release S106 monies from Bradfield
to provide new safety surfacing under three pieces of equipment.
This will enable this well used play area to continue to be used
safely.
Lead officer: Kristy Childs
To request to release S106 money to carry out
open space improvements.
Decision Maker: Assistant Director (Building & Public Realm)
Decision published: 14/01/2021
Effective from: 19/08/2020
Decision:
Request to release £31474.66 S106
monies. This to provide improved football and other facilities at
Rush Green, Clacton including pitch improvements.
Lead officer: Kristy Childs
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
To refuse planning permission
20/01273/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
To grant planning permission
20/01479/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 18/12/2020
Decision:
To grant planning permission
20/01539/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
To grant planning permission
20/01062/FUL
Lead officer: Alison Newland
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
To grant planning permission
20/01002/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
To grant planning permission
20/01383/FUL
Lead officer: Alison Newland
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
To grant planning permission
20/01542/ADV
Lead officer: Alison Newland
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 15/12/2020
Decision:
Lawful Use Certificate Granted
Lead officer: Alison Newland
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 18/12/2020
Decision:
Lawful Use Certificate Granted
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 18/12/2020
Decision:
To refuse planning permission
20/01528/ADV
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 18/12/2020
Decision:
Deemed Consent
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 23/12/2020
Decision:
To Grant Planning Permission
20/01529/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
To Grant Planning Permission
20/01586/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 18/12/2020
Decision:
To grant planning permission
20/01509/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 18/12/2020
Decision:
To grant planning permission
20/00436/ADV
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
Determination Prior Approval not
Required
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
To grant planning permission
20/01574/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
To refuse planning permission
20/01496/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
To Grant Planning Permission
20/01402/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
To refuse Planning Permission
20/01377/FUL
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 21/12/2020
Decision:
To grant planning permission
20/01153/FUL
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
Prior Approval not Required
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
To grant planning permission
20/01504/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
To Grant Planning Permission
20/01423/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
To grant planning permission
20/01359/LBC
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
To grant planning permission
20/01358/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
To refuse planning permission
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 14/01/2021
Effective from: 22/12/2020
Decision:
To grant planning permission
20/00678/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 22/12/2020
Decision:
To grant planning permission
20/00678/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01449/FUL
A Unilateral Undertaking in relation to this application is
attached relating to Open Space and RAMS and can be found in the
documents section of Public Access.
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01760/HHPNOT
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01667/FUL
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01703/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01661/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01668/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01546/LBC
Lead officer: Trevor Faulkner
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01535/FUL
Lead officer: Susanne Chapman-Ennos
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01662/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01699/FUL
Lead officer: Tracey Coleman
Part 3, Schedule 1 – Functions not to be
the responsibility of an Authority’s Executive. The discharge
of the Town
Decision Maker: Assistant Director (Planning)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
To grant planning permission
20/01471/FUL
Lead officer: Susanne Chapman-Ennos
21/00019/PHVRN Private Hire Vehicle Licence
Renewal
242 Mr J Wood
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00015/HCVRN Hackney Carriage Vehicle
Licence Renewal
T014 Mr M Heal
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 13/01/2021
Effective from: 13/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00018/BOATMG Boatman Licence
Mr T Bees is applying for a Boatman's Licence for the period of up
to 31 Mar 2021.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 12/01/2021
Effective from: 12/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00017/HCVRN Hackney Carriage Vehicle
Licence Renewal
T107 Mr D Whittam
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 12/01/2021
Effective from: 12/01/2021
Decision:
Granted
Lead officer: Karen Hayes
21/00016/HCVRN Hackney Carriage Vehicle
Licence Renewal
T058 Mr D Curtis
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 12/01/2021
Effective from: 12/01/2021
Decision:
Granted
Lead officer: Karen Hayes
14/00363/PREMGR Change of Designated Premises
Supervisor (DPS) Application
B
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 11/01/2021
Effective from: 11/01/2021
Decision:
Granted
Lead officer: Karen Hayes
20/00624/PREMTR Premises Licence
Transfer
Reg's Fish and Chips
21 St Johns Road, Clacton on Sea, Essex, CO15 4BS
Mr Y Mahir
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 11/01/2021
Effective from: 11/01/2021
Decision:
Granted
Lead officer: Karen Hayes
20/00615/SMDSIT Scrap Metal Site Licence
Fullers Auto Salvage Ltd
Stephenson Road West
Clacton on Sea, Essex, CO15 4TL
Mr A R Fuller and Mr D C Fuller are applying for a Scrap Metal Site
Licence for a period of three years.
The application conforms with all Statutory and Local Authority
requirements and all consultations have been undertaken where
required. The licence may, therefore, be granted and is submitted
for authority to issue under Delegated Powers.
Decision Maker: Corporate Director (Operations and Delivery)
Decision published: 11/01/2021
Effective from: 11/01/2021
Decision:
Granted
Lead officer: Karen Hayes
Decision Maker: Leisure and Public Realm Portfolio Holder
Decision published: 11/01/2021
Effective from: 20/01/2021
Decision:
That the new road under construction at the
development site - Land Rear of 19, The Street, Kirby-le-Soken,
Essex is named "Tamarisk Close".
Lead officer: Nina Underwood