Issue details

Walton-on-the-Naze Lifestyles is a vibrant TDC Sports Facility which was built in 1991. The Sports Centre’s pool is popular with residents and visitors to the area. The Centre was recently successful in its Funding application to Sport England for the second phase of the Swimming Pool Support Fund for a replacement Air Handling Unit and a new Building Management System at a total cost of £131,750 (Funding Application costs taken from an Energy Report commissioned to Concept Energy Solutions Ltd, dated 24th June 2021). Following on from the application a Feasibility Study was commissioned in February 2024 with Heaton Design
•Make allowances as required for the survey of the existing service provisions to assess the loadings.
•Visit the site as required to undertake non-intrusive survey work of the existing layout and services to establish site the constraints.
•Provision of RIBA stage 3 design associated with the new pool AHU, ductwork, controls etc.
•Outline requirements of temporary pool ventilation and existing ductwork cleaning.
•Provision of RIBA stage 3 design associated with replacement of the existing BMS.
•Liaise with specialists and suppliers.
•Provision of RIBA stage 3 electrical design to support the mechanical installation.
•Provision of RIBA stage 3 M

Decision type: Non-key

Decision status: Recommendations Approved

Notice of proposed decision first published: 15/08/2024

Decision due: 15 Aug 2024 by Corporate Director (Place & Wellbeing) & Deputy Chief Executive

Contact: Kieran Charles, Head of Sport and Leisure 01255686684, Email: kcharles@tendringdc.gov.uk Email: kcharles@tendringdc.gov.uk.

Decisions

Background papers