Agenda item

Erection of 1 dwelling and provision of access. Parking for both the existing and proposed dwelling.

Minutes:

The Committee had before it the published Officer report containing the key planning issues, relevant planning policies, planning history, any response from consultees, written representations received and a recommendation of approval subject to Section 106 agreement.

 

At the meeting, an oral presentation was made by the Council’s Planning Team Leader (SC-E) in respect of the application.

 

An update sheet had been circulated to the Committee prior to the meeting with details of:

 

(1)  a receipt of confirmation that the Section 106 legal agreement had been completed and;

(2)  Amendment to condition 6 to read:

 

“6. AGREEMENT OF MEASURES TO IMPROVE SUSTAINABILITY OF DEVELOPMENT

CONDITION:

 

Concurrent with the first reserved matter a scheme for the provision and implementation of water, energy and resource efficiency measures for the lifetime of the development shall be submitted to and approved, in writing, by the Local Planning Authority. The scheme such include as a minimum to achieve:-

- Agreement of provisions to ensure no more than 105 litres per person per day is used

- Agreement of carbon level

- Agreement of provisions to ensure the development is zero carbon ready

- An electric car charging points per dwelling

- A Water-butt per dwelling

- Compost bin per dwelling

- Agreement of heating of each dwelling/building

- Agreement of scheme for waste reduction

The scheme shall be fully implemented prior to the first occupancy of the development unless otherwise agreed in writing by the Local Planning Authority. The scheme shall be constructed and the measures provided and made available for use as may be agreed and thereafter shall be maintained.

 

REASON: To enhance the sustainability of the development through better use of water, energy and resources reduce harm to the environment and result in wider public benefit in accordance with the NPPF.

 

NOTE/S FOR CONDITION:

 

Slab level is normally refers to the concrete slab supported on foundations or directly on the subsoil and is used to construct the ground floor of the development. In any other case, please assume slab level to be the point before any walls and/or development can be visually above ground level or seek confirmation from the Local Planning Authority for your development.

 

The greatest threat to our planet is the belief that someone else will save it and also forgetting that small acts, when multiplied by millions of people, can transform the world. Developments will provide buildings/homes to thousands/millions of people over their lifetime. A well-designed sustainable development in the beginning will restrict the contribution each person makes to that threat and help enable them to transform the world.”

 

Peter Le Grys, the agent acting on behalf of the applicant, spoke in support of the application.

 

Town Councillor Nick Turner, representing Frinton and Walton Town Council, spoke against the application.

 

Matters raised by Members of the Committee:-

Officer’s response thereto:-

A member of the Committee asked if the parking arrangements had considered one accessway for both properties.

The Planning Officer confirmed that one access was proposed for both properties with suitable parking arrangements.

Could the indicative plan be refused preventing permission to build even though there was a detailed application?

The Planning Officer advised that the application could be refused and as a result, parking arrangements would resort to the original application detail.

 

Following discussion by the Committee, it was moved by Councillor Alexander, seconded by Councillor Fowler and RESOLVED that the Planning Manager (or equivalent authorised officer) be authorised to grant planning permission for the development, subject to the conditions and reasons or as need to be varied and those as may be deemed necessary by the Director of Planning as follows:-

 

Conditions and Reasons:                                                               

 

1 COMPLIANCE REQUIRED: TIME LIMIT FOR RESERVED MATTERS APPLICATION

CONDITION:

 

Application for approval of all outstanding and the final reserved matters for any phase of the development must be made to the Local Planning Authority not later than the expiration of three years beginning with the date of this permission, and the development must be begun not later than the expiration of two years from the final approval of the reserved matters for the relevant phase or, in the case of approval on different dates, the final approval of the last such matter to be approved.

 

REASON: To comply with the requirements of Section 92 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.

 

NOTE/S FOR CONDITION:

 

The reserved matters need to be received by the Local Planning Authority within the timeframe provided. Failure to comply with this condition will result in the permission becoming lapsed and unable to be carried out. If there is no phasing plan, this condition is considered to apply to the whole site as a single phase. If commencement takes place after the time lapses this may result in unlawful works at risk Enforcement Action proceedings. You should only commence works when all other conditions requiring agreement prior to commencement have been complied with.

 

2. APPROVAL OF RESERVED MATTERS CONDITION: No development in any phase shall commence until approval of the details

of:-

• the Appearance of the building(s) and place,

• Scale of the building(s),

• Layout of the building(s) and site,

• the means of Access,

• Landscaping

(hereinafter called "the reserved matters") for that particular phase have been submitted to

and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details and agreed order of phasing.

 

REASON: To enable the Local Planning Authority to secure an orderly and well-designed development in accordance with the character and appearance of the neighbourhood and in accordance with the Development Plan. This condition is required to be agreed prior to the commencement of any development in accordance with proper planning principles to allow public engagement on the outstanding reserved matters and ensure no significant adverse harm results.

 

NOTE/S FOR CONDITION:

 

This condition requires approval of all reserved matters as may be listed to agreed in writing prior to any commencement of the approved development. Failure to comply with this condition may result in the permission becoming lapsed and unable to be carried out. If there is no phasing plan, this condition is considered to apply to the whole site as a single phase.

 

The reserved matters that may be listed above are further defined under government guidance as follows:-

ACCESS: The accessibility to and within the site, for vehicles, cycles and pedestrians in terms of the positioning and treatment of access and circulation routes and how these fit into the surrounding access network.

APPEARANCE: The aspects of a building or place within the development which determine the visual impression the building or place makes, including the external built form of the development, its architecture, materials, decoration, lighting, colour and texture.

LANDSCAPING: The treatment of land (other than buildings) for the purpose of enhancing or protecting the amenities of the site and the area in which it is situated and includes: (a) screening by fences, walls or other means; (b) the planting of trees, hedges, shrubs or grass; (c) the formation of banks, terraces or other earthworks; (d) the laying out or provision of gardens, courts, squares, water features, sculpture or public art; and (e) the provision of other amenity features.

LAYOUT: The way in which buildings, routes and open spaces within the development are provided, situated and orientated in relation to each other and to buildings and spaces outside the development.

SCALE: The height, width and length of each building proposed within the development in relation to its surroundings.

 

1.    APPROVED PLANS & DOCUMENTS CONDITION:

The development hereby permitted shall be carried out in accordance with the drawings/documents listed below and/or such other drawings/documents as may be approved by the Local Planning Authority in writing pursuant to other conditions of this permission or such drawings/documents as may subsequently be approved in writing by the Local Planning Authority as a non-material amendment following an application in that regard (except for Listed Building Consents). Such development hereby permitted shall be carried out in accordance with any Phasing Plan approved, or as necessary in accordance with any successive Phasing Plan as may subsequently be approved in writing by the Local Planning Authority prior to the commencement of development pursuant to this condition.

 

Site Plan received 19th August 2020.

 

REASON: For the avoidance of doubt and in the interests of proper phased planning of the development.

 

NOTE/S FOR CONDITION:

 

The primary role of this condition is to confirm the approved plans and documents that form the planning decision. Any document or plan not listed in this condition is not approved, unless otherwise separately referenced in other conditions that also form this decision. The second role of this condition is to allow the potential process of Non Material Amendment if found necessary and such future applications shall be considered on their merits. Lastly, this condition also allows for a phasing plan to be submitted for consideration as a discharge of condition application should phasing be needed by the developer/s if not otherwise already approved as part of this permission. A phasing plan submission via this condition is optional and not a requirement.

 

Please note in the latest revision of the National Planning Policy Framework (NPPF) it provides that Local Planning Authorities should seek to ensure that the quality of approved development is not materially diminished between permission and completion, as a result of changes being made to the permitted scheme (for example through changes to approved details such as the materials used). Accordingly, any future amendment of any kind will be considered in line with this paragraph, alongside the Development Plan and all other material considerations.

 

Any indication found on the approved plans and documents to describe the plans as approximate and/or not to be scaled and/or measurements to be checked on site or similar, will not be considered applicable and the scale and measurements shown shall be the approved details and used as necessary for compliance purposes and/or enforcement action.

 

4. FURTHER APPROVAL - CONSTRUCTION MANAGEMENT TO BE AGREED (PRE

COMMENCEMENT) CONDITION:

 

Prior to the commencement of development details of the construction methodology and imetable shall be submitted to and approved, in writing, by the Local Planning Authority. This hall incorporate the following information:-

a) Details of the hours of work/construction of the development within which such operations shall take place and the hours within which delivery/collection of materials for the said construction shall take place at the site.

b) Details of the loading/unloading/storage of construction materials on site, including details of their siting and maximum storage height.

c) Details of how construction and worker traffic and parking shall be managed. This shall include routing of all traffic and any directional signs to be installed and where.

d) Details of any protection measures for footpaths and trees surrounding the site.

e) Details of any means of access to the site during construction.

f) Details of the scheduled timing/phasing of development for the overall construction period.

g) Details of measures to control the emission of dust and dirt during construction, and including details of any wheel washing to be undertaken, management and location it is intended to take place.

h) Details of the siting of any on site compounds and portaloos.

i) Details of the method of any demolition to take place, including the recycling and disposal of said materials resulting from demolition.

j) Site waste management plan (that shall include reuse and recycling of materials)

k) Scheme for sustainable construction management to ensure effective water and energy use.

l) Scheme of review of complaints from neighbours.

m) Registration and details of a Considerate Constructors Scheme

n) Details on the provision, location and management of any show home/s or reception, including opening times, parking and advertisements (including flags and directional signs).

The said methodology as may be approved shall be implemented in its entirety and shall operate as may be approved at all times during construction.

 

REASON: To minimise detriment to nearby residential and general amenity by controlling the construction process to achieve the approved development. This condition is required to be agreed prior to the commencement of any development as any construction process, including site preparation, by reason of the location and scale of development may result adverse harm in amenity.

 

NOTE/S FOR CONDITION:

 

You are strongly advised to discuss this condition with the Local Planning Authority and if possible/available local residents likely to be affected by this development prior to submission of details.

 

5. FURTHER APPROVAL - SURFACE AND FOUL WATER DRAINAGE DETAILS

CONDTION:

 

Full details of surface and foul water drainage shall have been submitted to and approved, in writing, by the Local Planning Authority prior to the commencement of any works to the building/s it would serve. No part of the building/s shall be first occupied or brought into use until the agreed method of surface and foul water drainage has been fully installed and is functionally available for use for that building/s. The surface and foul water drainage scheme shall thereafter be maintained as approved.

 

REASON: To safeguard the ground water environment from harm and minimise the risk of flooding.

 

NOTE/S FOR CONDITION:

 

This condition shall engage and requires details to be agreed prior to the commencement of works to the building/s approved. This condition is imposed to ensure the potential impact on a sensitive area is considered and harm avoided that may be detrimental to amenity and the environment.

 

6. AGREEMENT OF MEASURES TO IMPROVE SUSTAINABILITY OF DEVELOPMENT

CONDITION:

 

Concurrent with the first reserved matter a scheme for the provision and implementation of water, energy and resource efficiency measures for the lifetime of the development shall be submitted to and approved, in writing, by the Local Planning Authority. The scheme such include as a minimum to achieve:-

- Agreement of carbon level

- Agreement of provisions to ensure the development is zero carbon ready

- An electric car charging points per dwelling

- A Water-butt per dwelling

- Compost bin per dwelling

- Agreement of heating of each dwelling/building

- Agreement of scheme for waste reduction

The scheme shall be fully implemented prior to the first occupancy of the development unless otherwise agreed in writing by the Local Planning Authority. The scheme shall be constructe and the measures provided and made available for use as may be agreed and thereafter shall be maintained.

 

REASON: To enhance the sustainability of the development through better use of water, energy and resources reduce harm to the environment and result in wider public benefit in accordance with the NPPF.

 

NOTE/S FOR CONDITION:

 

Slab level is normally referred to the concrete slab supported on foundations or directly on the subsoil and is used to construct the ground floor of the development. In any other case, please assume slab level to be the point before any walls and/or development can be visually above ground level or seek confirmation from the Local Planning Authority for your development.

 

The greatest threat to our planet is the belief that someone else will save it and also forgetting that small acts, when multiplied by millions of people, can transform the world. Developments will provide buildings/homes to thousands/millions of people over their lifetime. A well-designed sustainable development in the beginning will restrict the contribution each person makes to that threat and help enable them to transform the world.