This report details the decision for the
procurement of new network infrastructure, replacing equipment that
is now either end of life or close to end of life, thus not
receiving the necessary security patches and updates. The network
replacement is therefore critical for cyber security reasons. The
procurement includes hardware replacement plus design,
configuration and implementation works which will be carried out by
Intergence Systems Limited.
Decision:
Officer decision for the procurement of
replacement network infrastructure, and for the design,
configuration and implementation works to be carried out by
Intergence Systems Limited.
The total costing of the solution including new infrastructure for
the estate and installation, setup, configuration, testing,
High-Level and Low-Level Designs, test plans and results is
£234,000. In this regard the reader should note that the
£233,337 replacement costs comprises;
1)£182,000,replacement hardware costs (*)
2)£52,000 Intergence Systems Ltd network re-design and
implementation/ installation costs.
In accordance with Council’s Budget and Policy framework this
procurement will be a direct award via the G-Cloud 14 framework LOT
3. Cabinet previously approved the budget for IT network renewal
costs report A.2 FINANCIAL PERFORMANCE REPORT 2024/25 –
GENERAL UPDATE at the end of July 2024 refers.
Alternative options considered:
1)Doing nothing is not an option.
2)A tender process would be very resource intensive and in this
instance is highly likely to;
a) Increase costs even if the incumbent contractor is
successful.
b) Result in a period of considerably reduced support performance
with a new provider ‘getting up to speed.
c) Expose the council to an unnecessary period of business
continuity and cybersecurity risk.
The reader should be aware that the re-design and installation and
support of our corporate ICT network is effectively giving the
chosen contractor “the keys to the kingdom” in respect
to unfettered access to our cyber-security and council-wide data
storage/ data flows. Consequently, the importance of proven
cyber-security and information governance and assurance expertise
and a trust-based contractor relationship cannot be
over-stated.
Publication date: 14/01/2025